Legislation Details

File #: 23-00442    Version: 1 Name:
Type: Legislative Action Item Status: Passed
File created: 5/24/2023 In control: City Council
On agenda: 7/20/2023 Final action: 7/20/2023
Enactment date: Enactment #:
Title: AWARD OF BID NO. 23-025 BAYVIEW PARK DRAINAGE IMPROVEMENTS AND REPAIRS PROJECT
Sponsors: D.C. Reeves
Attachments: 1. Bid Tabulation, Bid No. 23-025, 2. Final Vendor Reference List, Bid No. 23-025, 3. Project Location Map

LEGISLATIVE ACTION ITEM

 

SPONSOR:                         D.C. Reeves, Mayor

 

SUBJECT:

 

title

AWARD OF BID NO. 23-025 BAYVIEW PARK DRAINAGE IMPROVEMENTS AND REPAIRS PROJECT                     

end

 

RECOMMENDATION:

 

recommendation

That City Council approve Award of Bid No. 23-025 Bayview Park Drainage Improvements and Repairs project to C.W. Roberts, Inc., of Pensacola, Florida, the lowest and most responsible bidder with a base bid of $107,535.00 plus a 10% contingency in the amount of $10,753.50 for a total amount of $118,288.50. Further, that City Council authorize the Mayor to take the actions necessary to execute and administer this contract and complete the work, consistent with the bid, contracting documents, and the Mayor’s Executive Powers as granted in the City Charter.

end

body                

 

HEARING REQUIRED:  No Hearing Required

 

SUMMARY:

                                          

The purpose of this project is to provide stabilization to an area that is highly susceptible to erosion and sediment transport. There is evidence of existing erosion/washout issues onsite. This project involves the construction of 280 linear feet of 12-inch storm drainpipe with 4 inlets to collect stormwater runoff and convey it safely to an existing inlet. The three existing terraces will be improved by adding fill to provide a consistent height to the terraces. In addition, some depressions/washouts will be filled and stabilized.  All areas disturbed by construction will be sodded with the addition of 6 inches of topsoil as well as additional existing bare areas at the site. 

 

PRIOR ACTION:                     

 

None

 

FUNDING:                     

 

     Budget:                     $500,000.00                                          Bayview Erosion Rehabilitation

 

      Actual:                     $107,535.00                                          Construction Contract

                                              10,753.50                                          10% Contingency

                                              28,086.60                                          Engineering Management (Completed)

                                              41,341.50                                          Engineering Design (Completed)

                                              10,000.00                                          Engineering Management/Inspections (Estimate)

                                                5,000.00                                          Testing/Misc. (Estimate)

                                          $202,716.60                                          TOTAL

 

FINANCIAL IMPACT:

                     

Funding has been allocated in the Bayview Erosion Rehabilitation within the American Rescue Plan Fund in the Fiscal Year 2023 budget.

 

LEGAL REVIEW ONLY BY CITY ATTORNEY:    Yes

 7/5/2023

   

STAFF CONTACT:

 

Kerrith Fiddler, City Administrator

Amy Miller, Deputy City Administrator

Tonya Byrd, Interim Parks and Recreation Director

 

ATTACHMENTS:

 

1)                     Bid Tabulation, Bid No. 23-025

2)                     Final Vendor Reference List, Bid No. 23-025

3)                     Project Location Map

 

PRESENTATION:     No   end